Prefab vs Traditional Build

Two ways to create a home. Compare the costs, the process and what needs to happen on your property.

Haven expandable granny flat with grey cladding on a rural site
The Haven 20ft expandable granny flat · approximately 37m²

Your property. Your quote.

Get a Quote

01 / Cost comparison

The starting price is only part of the story

Compare like for like: your final quote should spell out the home, site work, approvals and connections.

Factory-built · 20ft / 37m²

Haven Prefab

Starting price

$58,000

What's included
Inclusions to be confirmed — e.g. unit + delivery. Final scope will be listed here.
Price per m²
To be confirmed — based on final scope and floor area.
Extra costs to budget for
  • Site works
  • Footings / foundations
  • Trade connections
  • Council and approval fees

May be included, excluded or allowed for in your quote. Confirm before committing.

Built on site · indicative range

Traditional Build

Starting price

$120,000–$250,000+

What's included
Typical scope: design, approval, site works, slab, fit-out and connections. Check what each builder's quote includes.
Price per m²
To be confirmed — based on final scope and floor area.
Extra costs to budget for
  • Site works
  • Footings / foundations
  • Trade connections
  • Council and approval fees

May be included, excluded or allowed for in your quote. Confirm before committing.

Traditional build costs sourced from 2026 Australian industry pricing data. Final pricing for both options varies by site conditions, location, and inclusions — contact us for an accurate quote for your property.

Source confirmation pending: the traditional price range is an owner-supplied benchmark; a published industry reference has not yet been provided.

02 / Project timeline

Build the home. Prepare the site. At the same time.

A traditional build moves through on-site construction. Prefabrication allows two work streams to move forward together, once approvals and site requirements are resolved.

Haven Prefab

01

Order confirmation

Confirm design, scope, approvals and site requirements.

Two work streams, running together

Factory production → Shipping

Your home is made, then transported to your site.

Site footings prepared

Site works and footings progress in parallel, ready for arrival.

  1. 02

    Crane installation

    1 day · on a prepared site with suitable access

  2. 03

    Trade connections

    Licensed trades connect power, water and wastewater.

  3. 04

    Occupation Certificate

    Final inspections and the applicable occupation certification.

Traditional Build

  1. 01

    Design

    Plans, specifications and project scope.

  2. 02

    Council approval

    2–6 months for a DA, or 10–20 days if eligible for Complying Development.

  3. 03

    Site works

    Prepare the site, foundations and services.

  4. 04

    Construction

    3–6 months · on-site building and fit-out

  5. 05

    Occupation Certificate

    Final inspections and the applicable occupation certification.

Potential time saved

To be confirmed against real project timelines.

— weeks estimate pending

Indicative stages, not a guaranteed completion schedule. Approval pathways, terminology and timing vary by state and property. No total Haven delivery time is assumed.

03 / What makes the difference

Less uncertainty. A considered choice.

Same compliance standard

NCC Class 1a applies to a permanent home, whether prefabricated or built on site. Site-specific approvals and certification still matter.

A clearer cost picture

A fixed-price prefab scope can provide certainty once confirmed. Traditional builds can face cost changes; either option needs clearly agreed inclusions and allowances.

More work in parallel

Preparing your site while the home is produced and shipped can shorten the overall schedule. Actual timing depends on approvals, freight and your property.

Single-day crane installation

The crane installation stage takes one day on a prepared, accessible site. Connections, inspections and occupation certification follow before handover.

04 / Common questions

Before you make your decision

Final inclusions and project details are awaiting confirmation. For now, ask us about your property.

Find out what your build will cost.

Get a quote based on your site, not an average.

Get a Quote
CallCheck my block